24/7
continuous generation
2 outputs
electricity and heat
4–8 months
project timeline
How we work
We analyse the composition and volume of the feedstock, calculate the biogas yield and size the digesters accordingly. The design is aligned with the waste logistics of the site.
What the project includes
Digesters and feeding system, CHP unit, automation, design and permits, installation, commissioning, and staff training.
How it works
The farm supplies the feedstock — manure and silage. After homogenisation and the acidification tank it enters the digester, where biogas forms in the absence of air. The gas is cleaned and fed to a CHP unit and a gas boiler, producing electricity and heat. The digestate passes through a separator and becomes liquid and solid biofertiliser.
Swipe the diagram sideways
Calculate the cost of your plant