from 3 m/s
cut-in wind speed
20 years
turbine service life
6–10 weeks
installation time
How we work
We start by assessing the wind resource of the site and selecting the tower height. Where wind is intermittent, we propose a hybrid layout with a solar array and battery storage.
What the project includes
Turbine and tower, foundation, controller and battery storage, design and permits, installation, commissioning, and maintenance.
How it works
Wind turns the rotor, the generator produces current, and the controller stabilises it using readings from the weather sensor. The inverter converts the current to grid standard, and the AC board distributes it between the site, the battery and the grid.